McD RUSSIA New Store Checklist
6. General Standards
• Drawings match the McD/ Architects layout (LO) drawing (any issues are clouded/ flagged). □
• All H&K text shown horizontally where possible.
□
• Russian Colour Legend shown on all layouts.
□
• Use McDonalds existing equipment symbols on Remodels where the equipment is not moved. □
• K4 Elevations only shown for new or relocated equipment.
□
Show local items if one item relocated. E.g. Apple Pie relocated to existing bagging station
– Show the Apple Pie on the bagging station in K4.
• Do not show walls on K4.
□
• All stations need to be against walls, no air gaps between them.
□
• Missing walls due to LO inaccuracy to be shown in green hatching (new walls).
□
• Change any English text shown on LO drawings using the translation below.
□
Moneyroom/office
Офис
Storage
Склад
Locker Male
Мужская раздевалка
Locker Female
Женская раздевалка
Crew
Комната отдыха персонала
7.
Clearances
(Minimum distances for Remodels & New Stores)
• Working operator (crew) space
900mm
□
• Front counter to Menu Board Wall
1100mm – 1500mm
□
• OAT to Fry/ Filet/ Grill
1200-1300mm
□
• OAT to Front Counter/ Beverage Cell
1600mm – 2000mm
□
• Parallel Beverage Cell
1200mm
□
• Current BIC
Sides 150mm Back 50mm
□
(Manitowoc V1)
Top 460mm Front 760mm
□
• New BIC (TBC)
Top breathing (clearance TBC)
□
• Shakes M/C
Sides 76mm
□
• Upright Freezers/ Chillers
Sides 50mm / Rear 50mm
□
• Futures
Show Future sizes as 960W x 980D
□
• Multiplex
Minimum wall to wall clearance of 1900mm required.
□
• Any distance not matching the min. requirement must be “revclouded”.
□
Page | 7
Made with FlippingBook - Online catalogs